Seamless steel pipe with magnetic

API Spec 5CT Casing pipe

In the construction and repair of gas pipeline welding operations, sometimes magnetic blow phenomena affect the welding process.

The formation of magnetic blow pipe metal present in remanence results. Typically, the remanence is divided into two kinds of induction magnetic and processes magnetic. Often produce magnetic induction pipe part in the factory, such as: metal smelting, using electromagnetic crane for loading and unloading, pipe parked in a strong magnetic field, the magnetization method with complete nondestructive inspection, pipe placed close to power lines and so powerful. Magnetic assembly processes often produce during welding operations and the use of a magnetic holder, clamps and pipe welding with DC, such as: prolonged contact with the DC power supply connected to electrical conductors, bare wire welding clamp and pipe segment or short-circuit and so on.

When the welding magnetic seamless steel tube, often can see the difficulties of arc ignition, arc burning stability of destruction, in the field of arc deviation, the liquid metal and slag melting body in the welding pool spatter. In order to stable welding process and improve the quality of welding joint, the magnetized steel pipe need to be degaussing before welding. It should be points out that it is difficult to achieve complete demagnetization for welded steel pipe.

So, when the remanence is insufficient to influence welding quality, and allows for welding.




Welded pipes by manufacturing process

Sunny Steel produce an extensive selection of welded steel pipe including ERW, HFI, EFW, LSAW, DSAW and UOE type carbon steel pipe along with their respective flanges and fittings.

Electric Resistance Welded Pipe
ERW
High Frequency Induction (HFI) Welded Pipe
HFI
UOE (Uing and Oing forming) Pipes
UOE
SAW


English Inglés SpanishEspañol

Contac Us

Sunny Steel Blog


SUNNY STEEL

Our team are highly trained and experienced in servicing and producing all types of steel supplies. Whether you've got a large construction project, or need parts for industrial machinery, our team of steel fabrication consultants will ensure that your project is provided with the parts you need, when you need them.

Link exchange

Copyright © 2011 Sunny Steel Enterprise Ltd.  All Rights Reserved ICP No.:08010763